PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing metal decking at Derrick -5 (4th Floor) Facing South-East (800x600).jpg Installed safety nets around Derrick -7 (2nd Floor) Facing South (800x600).jpg Metal decking at Derrick - 4 (4th Floor) Facing South (800x600).jpg
Previous pageNext page Installed safety nets around Derrick -7 (2nd Floor) Facing South (800x600)
Installed safety nets around Derrick -7 (2nd Floor) Facing South (800x600)